Difference between revisions of "Microscope Fabrication Readiness Review"
From GlueXWiki
(→Meeting Agenda) |
|||
Line 41: | Line 41: | ||
** Personnel training | ** Personnel training | ||
** Schedule and Tracking | ** Schedule and Tracking | ||
− | * Video meeting with Jlab and | + | * Video meeting with Jlab and UConn Financial people. |
** Billing and Reporting | ** Billing and Reporting | ||
* Continue Document Review (if needed). | * Continue Document Review (if needed). | ||
* Closeout | * Closeout | ||
* Adjourn | * Adjourn | ||
− | |||
== Microscope Information == | == Microscope Information == |
Revision as of 20:06, 17 January 2013
Contents
Date and Time
February 7, 2013
Video Connection information if needed
- ESNET and EVO session
- Phone only if requested:
- +1-866-740-1260 : US
- access code: 3421244# (remember the "#"). Phone line by request only.
Participants
UConn
- Richard Jones (Professor of Physics)
- James McIntyre (graduate student)
- Alex Barnes (undergraduate student)
JLab
- Fernando Barbosa (Hall D eletrical engineer)
- Eugene Chudakov (Hall D group leader) [not confirmed]
- Hovanes Egiyan (Hall D Staff)
- Bruce Lenzer (JLab ESH&Q)
- Elton Smith (Hall D Staff)
- Alexander Somov (Hall D Staff, SOTR)
- Timothy Whitlatch (Hall D engineer)
Topics/Issues that need discussion/resolution
Documents on the Microscope Construction
Meeting Agenda
- Project Overview
- Scope of contract and current review
- Status of construction
- Tour of the Construction Facilities.
- Technical Documents Review. Topics to be covered in going through the documents include the following.
- Final Construction Plan
- Quality Assurance Plans and Acceptance Test Plans
- Testing procedures
- Documentations and Travelers
- Personnel training
- Schedule and Tracking
- Video meeting with Jlab and UConn Financial people.
- Billing and Reporting
- Continue Document Review (if needed).
- Closeout
- Adjourn