Difference between revisions of "Microscope Prototype Beam Test"

From GlueXWiki
Jump to: navigation, search
m
Line 29: Line 29:
  
 
=== DAQ setup ===
 
=== DAQ setup ===
 +
 +
==== Configuration ====
 +
 +
 +
==== Connection/Operation instructions ====
 +
 +
* interface?
 +
* remote connection?

Revision as of 12:10, 20 September 2010

The purpose of this note is to gather all the information pertinent to the beam test of the tagger microscope prototype in Hall B planned for the fall of 2010.


Introduction

  • Proposal: [link TBA]


Schedule

  • JLab visit dates by UConn group:
    • Oct 7-11, 2010 (personnel: [TBA]) Goals:
      • instrumentation staging - testing of DAQ with microscope out of the Hall
      • completion of site requirements for work in the Hall by all members (walk through/down times?)

Setup

Counter positioning

  • Hall B Tagger Montecarlo
    • Source [link TBA]
    • Results [TBA]
  • Selected position: [info TBA]
    • Coordinates:
    • Position instructions:
    • Discriminator selection/positioning instructions:

DAQ setup

Configuration

Connection/Operation instructions

  • interface?
  • remote connection?