Microscope Prototype Beam Test

From GlueXWiki
Revision as of 12:42, 14 October 2010 by Senderovich (Talk | contribs) (Counter positioning)

Jump to: navigation, search

The purpose of this note is to gather all the information pertinent to the beam test of the tagger microscope prototype in Hall B planned for the fall of 2010.


Introduction

  • Proposal: [link TBA]


Schedule

  • JLab visit dates by UConn group:
    • Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals:
      • instrumentation staging - testing of DAQ with microscope out of the Hall (on the bench)

Setup

Counter positioning

SciFi alignment control GUI can be found linked on the control computer desktop in the E:\Tagger tree.
  • Hall B Tagger Montecarlo
    • Source [link TBA]
    • Results [TBA]
  • Selected position: [info TBA]
    • Coordinates:
    • Position instructions:
      • x-axis: the line marked on the sides of the foil window indicates the 0±2mm position of the scintillating fibers. (±8mm motion is possible)
    • Discriminator selection/positioning instructions:

DAQ setup

Configuration

Connection/Operation instructions

  • interface?
  • remote connection?