Difference between revisions of "Mini BCAL in Hall-D"

From GlueXWiki
Jump to: navigation, search
(mini BCAL Setup at Hall-D)
(Module Assignment)
Line 25: Line 25:
 
== Module Assignment ==
 
== Module Assignment ==
  
South - Upstream Module 49
+
{| class="wikitable" style="text-align:center;"
North - Downstream Module 49
+
|- style="font-weight:bold;"
 +
! Module Name
 +
! HV/LV Input Channel
 +
! Direction
 +
! After Cabling<br />
 +
|-
 +
| Module 49 Upstream
 +
| J7
 +
| South
 +
| [[File:MiniBCAL-South.jpeg|400px|thumb]]
 +
|-
 +
| Module 49 Downstream<br />
 +
| J8
 +
| North
 +
| [[File:MiniBCAL-North.jpeg|400px|thumb]]
 +
|}
  
 
== Wrapping the BCAL ==
 
== Wrapping the BCAL ==

Revision as of 18:03, 6 March 2023


mini BCAL Setup at Hall-D

The mini BCAL was set up on the test bench. Downstream is defined as the North end and the Upstream is defined as the South End

Downstream view of the mini BCAL setup.
Upstream view of the mini BCAL setup.
Top View of the mini BCAL setup



Cable stretching

The North and south end cables were grouped together and stretched across cables crates over to the DAQ.

Cable streching
Pillar along which the output cables are stretched.



Module Assignment

Module Name HV/LV Input Channel Direction After Cabling
Module 49 Upstream J7 South
MiniBCAL-South.jpeg
Module 49 Downstream
J8 North
MiniBCAL-North.jpeg

Wrapping the BCAL

DAQ Crate assignment