mini BCAL Setup at Hall-D

The mini BCAL was set up on the test bench. Downstream is defined as the North end and the Upstream is defined as the South End

Downstream view of the mini BCAL setup.
Upstream view of the mini BCAL setup.
Top View of the mini BCAL setup



Cable stretching

The North and south end cables were grouped together and stretched across cables crates over to the DAQ.

Cable streching
Pillar along which the output cables are stretched.



Module Assignment

Module Name HV/LV BCAL Distribution Box Direction Module Picture
Upstream 49
J7
South
MiniBCAL-South.jpeg
Upstream 49
J8

North
MiniBCAL-North.jpeg

Wrapping the BCAL

The mini BCAL was wrapped in black Tedlar after mounting the SiPM modules and connecting the LEMO output cables. After wrapping the BCAL was covered using a black cloth to make it light tight

mini BCAL wrapped in Black tedlar
mini BCAL after wrapping in Black cloth



DAQ Crate assignment

The output channels from the mini BCAL is connected to the following fADC crates.

fADC output crate
fADC output crate
fADC output crate