Mini FCAL Meeting Mon. Jan. 30, 2012

From GlueXWiki
Revision as of 11:49, 31 January 2012 by Leckey (Talk | contribs) (Agenda)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

Local logbook (http://opsweb.acc.jlab.org/CSUEApps/elog/elog.php?logbook=HDFCALTEST)

Offsite logbook (https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST)


  1. Detector Status (John):
    • alignment
    • gain balancing
    • resolution
    • timing
  2. DAQ Status (Alex):
    • pulse modes
    • scalars
    • Hall B DAQ integration
  3. Online Software (Dave)
  4. HV controls/EPICS (Hovanes)
  5. Future Plans (All):
    • Hall B energies
    • remote scintillator size change
    • remaining goals at current location
    • move to floor
    • remaining overall goals
    • BCAL test



Minutes

Attendance: John, Dave L., Alex, Kei


Detector (John)


-added units to detector sum, charge/event is 10-15 pC on average

-gain balancing converging, average of ~7% deviation from technique described in elog


DAQ (Alex)


-started pulse mode

-DAQ rate now 5kHz, up from 2kHz

-will try integral mode soon

-Hall b integration in next 2 weeks

-scalars also soon