Difference between revisions of "Minutes-1-17-2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
 
#* Production status (Dave)
 
#* Production status (Dave)
 
#* Second package tests (Lubomir)
 
#* Second package tests (Lubomir)
#* Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xls activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir, Bill, Dave)
+
# Basis of Estimate for the FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_FDC.xls activities] ,[http://www.jlab.org/Hall-D/detector/fdc/budget/BOE_guide.docx guideline] (Lubomir, Bill, Dave)
 
# Engineering (Bill)
 
# Engineering (Bill)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)

Revision as of 17:34, 16 January 2013

January 17, 2013 FDC meeting

Agenda

  1. Production Construction Tracking
    • Production status (Dave)
    • Second package tests (Lubomir)
  2. Basis of Estimate for the FDC activities ,guideline (Lubomir, Bill, Dave)
  3. Engineering (Bill)
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
    • Fourth package tests
  6. Other