Difference between revisions of "Minutes-1-19-2012"
From GlueXWiki
Line 6: | Line 6: | ||
#* Production update | #* Production update | ||
#* First package cabling | #* First package cabling | ||
− | # Engineering update [http://www.jlab.org/Hall-D/detector/fdc/wire_deadening | + | # Engineering update [http://www.jlab.org/Hall-D/detector/fdc/wire_deadening/Lrg-dia_w1_x1000_edge-3d.jpg new diameter wire deadening],[http://www.jlab.org/Hall-D/detector/fdc/wire_deadening/Lrg-dia_w1_x1000_center1-3d.jpg] (Bill) |
# Electronics update (Chris) | # Electronics update (Chris) | ||
#* Pre-amp cards | #* Pre-amp cards |
Revision as of 16:33, 19 January 2012
January 19, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- First package cabling
- Engineering update new diameter wire deadening,[1] (Bill)
- Electronics update (Chris)
- Pre-amp cards
- LV cabling
- Testing in 126 (Beni)
- Other