January 19, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Production update
    • First package cabling
  2. Engineering update new diameter wire deadening,[1] (Bill)
  3. Electronics update (Chris)
    • Pre-amp cards
    • LV cabling
  4. Testing in 126 (Beni)