January 30, 2014 FDC meeting

Agenda

  1. Installation [1],[2] (all)
  2. Engineering December 2013 survey
  3. Electronics (Chris, Nick)
  4. Mini-DAQ results FDC E-log (Beni)
  5. Other

Minutes

Participants: Fernando, Dave, Nick, Chris, Simon, Beni, Eugene, and Lubomir.

Installation

- Casey, Tina and Anatoly finished cabling the FDC at the detector side and it looks nice (first picture attached). On Tuesday the platform on the right side was opened and today Nick and Chris started routing the right bottom quadrant to the electronics. They are done with package #4 working now on #3. Since we will have all the cables routed to the right racks we will start at the same time plugging the cables to the modules. Not all the modules are in place, but Nick and Chris will install the missing modules (now Cody has them) and Fernando agreed.

- HV: was stable since the beginning of the week at +2200V/-500V, except for 6 channels at +2200/-450V and three channels at +2200/-500V, out of 96 total number of HV channels. Such change of the field voltage on these 9 channels affects the biggest drift times/distances where the resolution is in any case poor, so the average track resolution will not be affected. Note also that +2200V is the upper limit of the HV range and we may not need to be there.

- Gas: since Tuesday we are running gas at 400ccpm (according to the mass flow controller set point) compared to 800ccpm before, because we don't have more bottles and the next ones are expected to come next week. This morning somebody working at upstream face of the magnet, pulled the exhaust gas line and we found (also in the morning) the bubbler and a "quick-connect" connector disconnected. As a result the pressure went down to ~20Pa from ~60Pa. The pressure recovered in about two hours. At the end of last week one of the bubblers stopped bubbling and the pressure started increasing (as usual), however, after inserting a tube and the output of the bubbler going inside the oil (second picture attached) it started bubbling again with high rate and the bubbling is very stable since then.


Engineering