Difference between revisions of "Minutes-10-14-2010"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
 
# Full-scale prototype tests (Beni, Lubomir)
 
# Full-scale prototype tests (Beni, Lubomir)
 
#* status of gas mixture studies
 
#* status of gas mixture studies
#* testing fADC125  
+
#* tests with fADC125  
 
# Other
 
# Other
  

Revision as of 16:07, 13 October 2010

October 14, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Blue Crab status
    • Frame production, lamination
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs
    • Cathode foil procurement
  3. Engineering (Bill, David)
    • Wire stringing: fixtures, movement system
    • Other
  4. Full-scale prototype tests (Beni, Lubomir)
    • status of gas mixture studies
    • tests with fADC125
  5. Other