October 14, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Blue Crab status
    • Frame production, lamination
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs
    • Cathode foil procurement
  3. Engineering (Bill, David)
    • Wire stringing: fixtures, movement system
    • Other
  4. Full-scale prototype tests (Beni, Lubomir)
    • status of gas mixture studies
    • tests with fADC125
  5. Other


Minutes

Participants: Eugene, Fernando, Bill, Chris, Roger, Casey, Mark, Glenn, and Lubomir.

Production

- At Blue Crab now we occupy some space at the far corner not to interfere with the installation work there. We have there two granite tables and one round. Casey will order two more round tables. Need additional temporary light. AC for the whole building is coming soon. JLab internet connection and two plain phones will be installed in the office.

- Five wire frames were laminated with Rohacell rings and sent back to the company for flat cut. Last two laminated at Blue Crab. Five new frames will come soon. Two new Rohacell rings are ready.

Electronics

- The first article populated PCBs will be at JLab next week. They will be checked, channel by channel, and will be ready by the end of October. Then the first PCB ring will be glued, most likely in 126. By the end of November we will have all the PCBs ready. They will be stored in F117.

- No news from the procurement about companies (other than Allflex) interested in the cathode production. The deadline was Oct.13. As Fernando promised before, he will take care of the procurement (not a sole source!) of the rigid-flex. Fernando and Roger will contact Allflex for the details of the rigid-flex production.

- Fernando submitted a PR for the mini HV cables.

Engineering