Difference between revisions of "Minutes-10-21-2010"
From GlueXWiki
Line 3: | Line 3: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # Production | + | # Production |
− | #* Blue Crab status | + | #* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch] |
#* Frame lamination | #* Frame lamination | ||
#* other: FastTrack changes | #* other: FastTrack changes |
Revision as of 15:52, 20 October 2010
October 14, 2010 FDC meeting
Tentative Agenda
- Production
- Blue Crab status sketch
- Frame lamination
- other: FastTrack changes
- Electronics (Fernando, Chris, Roger)
- Update on PCBs
- Cathode foil and rigid-flex procurement
- Engineering (Bill, David)
- Wire stringing
- Gluing and soldering materials
- Full-scale prototype tests (Lubomir)
- gas mixture studies
- Other