Difference between revisions of "Minutes-10-21-2010"
From GlueXWiki
Line 6: | Line 6: | ||
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch] | #* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch] | ||
#* Frame lamination | #* Frame lamination | ||
− | #* other: | + | #* other: changes to [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_production_5techs.pdf FastTrack] |
# Electronics (Fernando, Chris, Roger) | # Electronics (Fernando, Chris, Roger) | ||
#* Update on PCBs | #* Update on PCBs |
Revision as of 15:57, 20 October 2010
October 14, 2010 FDC meeting
Tentative Agenda
- Production
- Electronics (Fernando, Chris, Roger)
- Update on PCBs
- Cathode foil and rigid-flex procurement
- Engineering (Bill, David)
- Wire stringing
- Gluing and soldering materials
- Full-scale prototype tests (Lubomir)
- gas mixture studies
- Other