Difference between revisions of "Minutes-10-21-2010"

From GlueXWiki
Jump to: navigation, search
Line 23: Line 23:
  
 
== Production ==
 
== Production ==
 +
 +
- We have a new technician, Al, joining the FDC group.
  
 
- David: Setting up the off-site space: temporary lights were installed, more cabinets to be moved there. Working on the safety papers. The use of Hysol requires eye wash station that will be put in place tomorrow. David will contact the clean room company so that our stuff doesn't interfere with the construction. They will start bringing materials at the beginning of November. We should use the space at the angle of the shelving fences, we have 18' our space (see the sketch linked above).
 
- David: Setting up the off-site space: temporary lights were installed, more cabinets to be moved there. Working on the safety papers. The use of Hysol requires eye wash station that will be put in place tomorrow. David will contact the clean room company so that our stuff doesn't interfere with the construction. They will start bringing materials at the beginning of November. We should use the space at the angle of the shelving fences, we have 18' our space (see the sketch linked above).
  
-  We get 5 wire frames each week and send another 5 laminated with the Rohacell rings, back for fly cut. For now 10 wire frames were laminated.   
+
-  We get 5 wire frames each week from the company and send another 5 laminated with the Rohacell rings, back for fly cut. For now 10 wire frames were laminated. David, Casey, and Al are doing this job.
 +
 
 +
- We should change the FastTrack for the FDC production to reflect the fact that we will have the wire frames ready before the full production starts.
  
 
- Five wire frames were laminated with Rohacell rings and sent back to the company for flat cut. Last two laminated at Blue Crab. Five new frames will come soon. Two new Rohacell rings are ready.
 
- Five wire frames were laminated with Rohacell rings and sent back to the company for flat cut. Last two laminated at Blue Crab. Five new frames will come soon. Two new Rohacell rings are ready.

Revision as of 17:14, 21 October 2010

October 21, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs
    • Cathode foil and rigid-flex procurement [1]
  3. Engineering (Bill, David)
    • Wire stringing
    • Gluing and soldering materials
  4. Full-scale prototype tests (Lubomir)
  5. Other