Difference between revisions of "Minutes-10-28-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 9: Line 9:
 
#* Update on PCBs   
 
#* Update on PCBs   
 
#* Cathode foil and rigid-flex procurement
 
#* Cathode foil and rigid-flex procurement
#* fADC125/F1TDC synchronization (Beni, Gerard)
+
#* fADC125/F1TDC synchronization (Beni, Gerard) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 531]
 
# Engineering (Bill, David)
 
# Engineering (Bill, David)
 
#* Wire stringing  
 
#* Wire stringing  
Line 15: Line 15:
 
# Full-scale prototype tests (Lubomir)
 
# Full-scale prototype tests (Lubomir)
 
#* gas gain measurements [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 530]
 
#* gas gain measurements [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 530]
#* other studies with fADC
+
#* other studies with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 532]
 
# Other
 
# Other
  

Revision as of 11:45, 28 October 2010

October 21, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs
    • Cathode foil and rigid-flex procurement
    • fADC125/F1TDC synchronization (Beni, Gerard) FDC Log Book, page 531
  3. Engineering (Bill, David)
    • Wire stringing
    • Cathode foils: plans for inspection, storage, and cathode lamination
  4. Full-scale prototype tests (Lubomir)
  5. Other