Line 4: Line 4:
  
 
# Production (David)
 
# Production (David)
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
+
#* Blue Crab status [ttp://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
#* Frame lamination
+
#* Frame lamination [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 533]
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
 
#* Update on PCBs   
 
#* Update on PCBs   
Line 21: Line 21:
  
 
= Minutes =
 
= Minutes =
Participants: Fernando, Bill, Al, David, Chris, Glenn, Simon, and Lubomir.
+
Participants: Fernando, Eugene, Casey, Bill, Mark, David, Chris, Simon, Glenn, Roger, Beni, Gerard (on the phone) and Lubomir.
  
 
== Production ==
 
== Production ==
  
- We have a new technician, Al, joining the FDC group.  
+
- The humidity was very high yesterday (above 80%) at Blue Crab and the Rohacell material that was not laminated was deformed. We still have to check if the four laminated wire frames that are at Blue Crab are OK.  
  
 
- David: Setting up the off-site space: temporary lights were installed, more cabinets to be moved there. Working on the safety papers. The use of Hysol requires eye wash station that will be put in place tomorrow. David will contact the clean room company so that our stuff doesn't interfere with the construction. They will start bringing materials at the beginning of November. We should use the space at the angle of the shelving fences, we have 18' our space (see the sketch linked above).
 
- David: Setting up the off-site space: temporary lights were installed, more cabinets to be moved there. Working on the safety papers. The use of Hysol requires eye wash station that will be put in place tomorrow. David will contact the clean room company so that our stuff doesn't interfere with the construction. They will start bringing materials at the beginning of November. We should use the space at the angle of the shelving fences, we have 18' our space (see the sketch linked above).

Revision as of 18:09, 28 October 2010

October 21, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status [ttp://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
    • Frame lamination FDC Log Book, page 533
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs
    • Cathode foil and rigid-flex procurement
    • fADC125/F1TDC synchronization (Beni, Gerard) FDC Log Book, page 531
  3. Engineering (Bill, David)
    • Wire stringing
    • Cathode foils: plans for inspection, storage, and cathode lamination
  4. Full-scale prototype tests (Lubomir)
  5. Other