Line 25: Line 25:
 
- The short term plan: since we think the survey of the FDC in final position is doable we can go ahead and put FDC back on the platform (on Friday). Then we will move it in and out of the magnet and do the survey in both positions. Tom will have people working on the cable mesh. After it's done we can start cabling.  
 
- The short term plan: since we think the survey of the FDC in final position is doable we can go ahead and put FDC back on the platform (on Friday). Then we will move it in and out of the magnet and do the survey in both positions. Tom will have people working on the cable mesh. After it's done we can start cabling.  
  
- FDC was moved to the Hall a week ago (Oct 24) (see pictures attached).
+
- FDC was moved to the Hall a week ago (Oct 24) (see pictures attached). Since then it is continuously flashed with gas and it bubbles normally. We tried to insert FDC in the magnet and it was almost flash with the upstream end of BCAL but got stuck there. The problem was the HV connector caught the head of a screw on the rails (last picture). The size of the heads turned out to be bigger for the rails inside the BCAL. These screws will be replaced (one by one); at the same time the the plates holding the HV connector were modified the move the connector close to the beam. Since Monday the FDC is down on the floor for the survey. It was not possible to do it on the platform. There Casey also connected the cooling manifolds with tubes. 
  
 
== Engineering ==
 
== Engineering ==
  
- The mesh cylinder has not been assembled yet and Tom is looking for the parts. Bill will take care of this.
+
- Apart from the above discussions Eugene asked about the status with the chilled water and the cooling system. Bill: the piping is done and they are now testing it. Eugene: what is the water pressure (100psi) and what will happen if the piping breaks (very bad).
  
 
== Electronics ==
 
== Electronics ==
  
- Nick needs the last signal cables from 126 that has not been labeled yet. Most of them are packed in boxes and ready to be moved but 35 are used by Beni in the test F1TDC test, so these will be taken next week. Vlad installed the last pre-amp on the FDC that had to be replaced.
+
- Nick made a presentation (linked above) 
  
 
== Tests at EEL126 ==
 
== Tests at EEL126 ==

Revision as of 17:49, 31 October 2013

October 31, 2013 FDC meeting

Agenda

  1. Installation [1]
  2. Engineering (Bill)
  3. Electronics (Chris, Nick) list of cablesNick's presentation about cable locations on platform
  4. Tests in EEL126 FDC E-log (Beni)
    • New F1TDC
  5. Other