Difference between revisions of "Minutes-10-7-2010"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
= Tentative Agenda =
 
= Tentative Agenda =
  
# Productio
+
# Production
 
#* Blue Crab status
 
#* Blue Crab status
 
#* Frame production
 
#* Frame production

Revision as of 16:04, 6 October 2010

October 7, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Blue Crab status
    • Frame production
  2. Electronics
    • Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
  3. Engineering (Bill and David)
    • Wire stringing: fixtures, movement system
    • Other: gas system using methane
  4. Full-scale prototype
    • testing fADC125 (Beni)
    • plateau studies with 80/20 (Beni)
    • resolutions with different gas mixtures and HV (Lubomir)
    • argon/CO2/methane gas mixture properties (Lubomir)
  5. Other