Difference between revisions of "Minutes-10-7-2010"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
# Electronics  
 
# Electronics  
 
#* Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
 
#* Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
# Engineering (Bill and David)
+
# Engineering
#* Wire stringing: fixtures, movement system
+
#* Wire stringing: fixtures, movement system (Bill, David)
 +
#* Update on tension measurements (Lubomir)
 +
#* Wire tension requirements (Lubomir)
 
#* Other: gas system using methane
 
#* Other: gas system using methane
 
# Full-scale prototype  
 
# Full-scale prototype  

Revision as of 17:01, 6 October 2010

October 7, 2010 FDC meeting

Tentative Agenda

  1. Production
    • Blue Crab status
    • Frame production
  2. Electronics
    • Update on PCBs, fADC125 and other (Fernando, Chris, Gerard)
  3. Engineering
    • Wire stringing: fixtures, movement system (Bill, David)
    • Update on tension measurements (Lubomir)
    • Wire tension requirements (Lubomir)
    • Other: gas system using methane
  4. Full-scale prototype
    • testing fADC125 (Beni)
    • plateau studies with 80/20 (Beni)
    • resolutions with different gas mixtures and HV (Lubomir)
    • argon/CO2/methane gas mixture properties (Lubomir)
  5. Other