Difference between revisions of "Minutes-10-9-2014"
From GlueXWiki
Line 16: | Line 16: | ||
# Commissioning [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Wiki Page] (all) | # Commissioning [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Wiki Page] (all) | ||
# Other | # Other | ||
+ | |||
+ | |||
+ | = Minutes = | ||
+ | #DAQ: | ||
+ | ## New firmware enables readout mode 7 | ||
+ | ## All spare modules used: move additional problem modules to highest slots and disable them from readout | ||
+ | ## Goal is to identify all problematic modules in the FDC and CDC crates by next Monday. | ||
+ | #CDC: | ||
+ | ## develop plugins for detector efficiency | ||
+ | ## generate efficiency data as function of HV | ||
+ | #FDC: | ||
+ | ## Vlad is working on strip calibration | ||
+ | #Electronics: | ||
+ | ## First article of FA125 by mid month, new modules expected by beginning next month | ||
+ | ## temperature sensors for CDC to be installed: one in the air-pipe and one next to the hottest board | ||
+ | ## label ribbon cable from trigger crate to TDC in crate rocfdc1 | ||
+ | # Commissioning: | ||
+ | ## need to create procedure to turn on FDC and CDC for the first time with beam. |
Revision as of 15:01, 9 October 2014
October 9, 2014 FDC+CDC meeting
Connection
- Instructions for Bluejeans meeting connection
- FDC meeting ID: 290664653
- To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.
Agenda
- DAQ (Beni)
- CDC update (Mike)
- FDC update (Vlad)
- Electronics (Fernando)
- Engineering
- Commissioning Wiki Page (all)
- Other
Minutes
- DAQ:
- New firmware enables readout mode 7
- All spare modules used: move additional problem modules to highest slots and disable them from readout
- Goal is to identify all problematic modules in the FDC and CDC crates by next Monday.
- CDC:
- develop plugins for detector efficiency
- generate efficiency data as function of HV
- FDC:
- Vlad is working on strip calibration
- Electronics:
- First article of FA125 by mid month, new modules expected by beginning next month
- temperature sensors for CDC to be installed: one in the air-pipe and one next to the hottest board
- label ribbon cable from trigger crate to TDC in crate rocfdc1
- Commissioning:
- need to create procedure to turn on FDC and CDC for the first time with beam.