Minutes-10-9-2014

From GlueXWiki
Revision as of 04:01, 1 April 2015 by Marki (Talk | contribs) (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

October 9, 2014 FDC+CDC meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. FDC meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. DAQ (Beni)
  2. CDC update (Mike)
  3. FDC update (Vlad)
  4. Electronics (Fernando)
  5. Engineering
  6. Commissioning Wiki Page (all)
  7. Other


Minutes

  1. DAQ:
    1. New firmware enables readout mode 7
    2. All spare modules used: move additional problem modules to highest slots and disable them from readout
    3. Goal is to identify all problematic modules in the FDC and CDC crates by next Monday.
  2. CDC:
    1. develop plugins for detector efficiency
    2. generate efficiency data as function of HV
  3. FDC:
    1. Vlad is working on strip calibration
  4. Electronics:
    1. First article of FA125 by mid month, new modules expected by beginning next month
    2. temperature sensors for CDC to be installed: one in the air-pipe and one next to the hottest board
    3. label ribbon cable from trigger crate to TDC in crate rocfdc1
  5. Commissioning:
    1. need to create procedure to turn on FDC and CDC for the first time with beam.