Participants: Eugene, Bill, Dave, Chris, Nick, Vlad, Simon, and Lubomir.
+
Participants: Eugene, Bill, Dave, Chris, Nick, Vlad, Simon, Beni, and Lubomir.
  
 
== Production ==
 
== Production ==
  
- Dave deadened wire plane #29. Casey and Tina may come next Saturday to string wire plane #30. Will have the gas on Monday, hopefully by the end of the week will start testing the first package. Anatoly is refurbishing the cathodes for package #2. He removed the foil on four cathodes and started the fifth. We decided to stop the refurbishment until we are sure we have the foils. The foils are supposed to be here at the end of November.  
+
- Casey and Tina will come this Saturday to string wire frame #30. Dave will then work on it. This is the last frame we need for package #4, but will make two more spare wire frames. Answering Eugene's question: we will have to make four more cathodes to finish with the package production, but eight more cathodes will be done as spares.
  
- Bill: do we need first article for the foils to check if there are problems. Since this is the same company (Allflex) they know how to do them and what do we need. We didn't have problems with the foils before, Anatoly tested all of them strip by strip. Initially there was some discoloration on the copper and some wrinkles from the wheels of the machine, but they fixed the problems. Lubomir will discuss this with Roger, in case they see some problem to inform us. Eugene: we can use 5um foil, it will work except it will be thicker.
+
- The gas (40/60) will be delivered to Blue Crab next Wednesday. In the mean time we found a 40/60 gas bottle delivered by mistake to JLab. We already started using it for the package #3 tests, since we didn't have Ar. Nevertheless, we decided to take it from JLab and use it at Blue Crab to start testing package #1. We expect to have Ar bottle soon to use at at JLab.  
  
== Cathode corrosion ==
+
== Cathode corrosion test ==
 
+
- One more sample failed (possibly "Viton only") after 12 days exposure. The first one failed after 4 days (EPDM most likely). Will wait four weeks in total then will lower the temperature. Bill and Eugene are surprised that Apiezon "evaporates" at 100degC. In this case Viton and Viton+Apiezon samples at this high temperature must be similar, but actually there still might be some residue from the Apiezon, even it's not greasy. In any case such experiment will give you only a lower limit because: 1) Apiezon is different at 100degC 2) humidity is 100%.
+
  
 +
- No news, the lower limit now for the time before corrosion is 1-3 years, depending on the activation energy. We will continue with the tests till Monday, then will open the chamber and prepare another set of samples to be tested at lower (65degC) temperature. This will give us an estimate of the activation energy within a month.
 +
 
 
== Engineering ==
 
== Engineering ==
  
- Bill found a better colling unit (SMC), that compared to the old one (Trillium) has several advantages: it's new (not refurbished like Trillium), SMC monitors the return line as well so can identify leakage, and has RS-454 standard, and more energy efficient. Bill wants to order the SMC unit. Some additional stuff (flowmeters, bypass of the gear pump) still needs to be added to the system.  
+
- Bill has ordered some part of the cooling system and is working on the documentation for the rest.
  
- Bill is ordering different materials for the fiducials, package spacers. Waitiing for the Norel manifolds to be able to install the cooling system on the packages. 
+
- Bill is in contact with Ron Bartek and Paul Powers about possible solutions for the cooling of 126. After the meeting Walt Akers came with a solution to install three ceiling fans to blow the hot air to the high bay (target) area using flexible ducts. Cooler air from the high bay will be drawn through a
 
+
louver that will be mounted at ground level.
- Cooling in 126: Bill discussed the problem with Tim and Ron Bartek. The max power in 126 is expected to be ~20kW, several options have been discussed ranging in $20-60k. The paradox is that the problem is not the cooling, but the heating! When it's cold outside the heater starts working and we can't stop it because it's used by several other "cold" areas. Most likely fixing it will take months and money. With the shift in the weather it will be dangerous to keep the chambers in 126. We discussed different options to move the testing set-up: the best would be to move it to Blue Crab. Questions: do we have enough power there, other limitations like using sources, internet speed,  DAQ subnet. Bill: it will take time and efforts to move but in the long run it will be an advantage.
+
  
 
== Electronics ==
 
== Electronics ==
  
- Chris: Daughter cards shipped for population, will have them ready next week.  
+
- Chris: Daughter cards shipped for population last week, company confirmed that all is ok, will have them ready next week.  
  
 
== Third package tests ==
 
== Third package tests ==
 +
 +
<!--
  
 
- Beni made the software for testing the cathodes and tested three cells over the weekend (Elog #93). Lubomir and Vlad finished the other three cells (Elog #94). In total there were problems with four channels, but all were fixed by pushing the cards and bending the tubes. Now all the cathode and wire channels are tested and are working fine.  
 
- Beni made the software for testing the cathodes and tested three cells over the weekend (Elog #93). Lubomir and Vlad finished the other three cells (Elog #94). In total there were problems with four channels, but all were fixed by pushing the cards and bending the tubes. Now all the cathode and wire channels are tested and are working fine.  

Revision as of 18:36, 1 November 2012

November 1, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Corrosion tests (Vlad)
  3. Engineering (Bill)
    • 126 cooling
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni, Simon)
    • Moving to Blue Crab?
  6. Other

Minutes

Participants: Eugene, Bill, Dave, Chris, Nick, Vlad, Simon, Beni, and Lubomir.

Production

- Casey and Tina will come this Saturday to string wire frame #30. Dave will then work on it. This is the last frame we need for package #4, but will make two more spare wire frames. Answering Eugene's question: we will have to make four more cathodes to finish with the package production, but eight more cathodes will be done as spares.

- The gas (40/60) will be delivered to Blue Crab next Wednesday. In the mean time we found a 40/60 gas bottle delivered by mistake to JLab. We already started using it for the package #3 tests, since we didn't have Ar. Nevertheless, we decided to take it from JLab and use it at Blue Crab to start testing package #1. We expect to have Ar bottle soon to use at at JLab.

Cathode corrosion test

- No news, the lower limit now for the time before corrosion is 1-3 years, depending on the activation energy. We will continue with the tests till Monday, then will open the chamber and prepare another set of samples to be tested at lower (65degC) temperature. This will give us an estimate of the activation energy within a month.

Engineering

- Bill has ordered some part of the cooling system and is working on the documentation for the rest.

- Bill is in contact with Ron Bartek and Paul Powers about possible solutions for the cooling of 126. After the meeting Walt Akers came with a solution to install three ceiling fans to blow the hot air to the high bay (target) area using flexible ducts. Cooler air from the high bay will be drawn through a louver that will be mounted at ground level.

Electronics

- Chris: Daughter cards shipped for population last week, company confirmed that all is ok, will have them ready next week.

Third package tests