Difference between revisions of "Minutes-11-11-2010"
From GlueXWiki
Line 1: | Line 1: | ||
− | November | + | November 11, 2010 FDC meeting |
= Tentative Agenda = | = Tentative Agenda = |
Revision as of 17:41, 10 November 2010
November 11, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- Frame lamination
- Electronics (Fernando, Chris, Roger)
- Update on PCBs: delaminated PCB1 and PCB2
- Cathode foil and rigid-flex procurement
- Cathode foil inspection plan
- Engineering (Bill, David)
- Wire stringing status; position measurement system.
- Other
- Full-scale prototype tests
- status, timing with fADC125 (Beni)FDC Log Book, page 535
- wire offset studies (Lubomir)FDC Log Book, pages 534 and 536
- Other