Difference between revisions of "Minutes-11-11-2010"
From GlueXWiki
Line 4: | Line 4: | ||
# Production (David) | # Production (David) | ||
− | #* Blue Crab status | + | #* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch] |
#* Frame lamination | #* Frame lamination | ||
+ | #* Production plan | ||
# Electronics (Fernando, Chris, Roger) | # Electronics (Fernando, Chris, Roger) | ||
− | #* Update on | + | #* Update on PCB inspection |
− | #* Cathode foil | + | #* Other |
− | + | #* Cathode foil production | |
+ | #* Rigid-flex procurement | ||
# Engineering (Bill, David) | # Engineering (Bill, David) | ||
− | #* Wire stringing status; | + | #* Wire stringing status; stepper motor controller. |
#* Other | #* Other | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
− | #* | + | #* timing with fADC125 (Beni) |
− | #* | + | #* cathode resolution studies (Simon and Lubomir)[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 537-538] |
# Other | # Other | ||
Revision as of 18:00, 10 November 2010
November 11, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status sketch
- Frame lamination
- Production plan
- Electronics (Fernando, Chris, Roger)
- Update on PCB inspection
- Other
- Cathode foil production
- Rigid-flex procurement
- Engineering (Bill, David)
- Wire stringing status; stepper motor controller.
- Other
- Full-scale prototype tests
- timing with fADC125 (Beni)
- cathode resolution studies (Simon and Lubomir)FDC Log Book, pages 537-538
- Other