Difference between revisions of "Minutes-11-11-2010"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
#* Cathode foil production  
 
#* Cathode foil production  
 
#* Rigid-flex procurement
 
#* Rigid-flex procurement
# Engineering (Bill, David)
+
# Engineering (Bill, David, Beni)
 
#* Wire stringing status; stepper motor controller.  
 
#* Wire stringing status; stepper motor controller.  
 
#* Other
 
#* Other

Revision as of 18:18, 10 November 2010

November 11, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
    • Production plan
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCB inspection
    • Other
    • Cathode foil production
    • Rigid-flex procurement
  3. Engineering (Bill, David, Beni)
    • Wire stringing status; stepper motor controller.
    • Other
  4. Full-scale prototype tests
  5. Other