Difference between revisions of "Minutes-11-18-2010"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production (David)
 
# Production (David)
 
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
 
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/production/BCplan.pdf sketch]
#* Frame lamination
+
#* Frame lamination  
#* FDC change request discussion   
+
#* FDC change request discussion  [http://www.jlab.org/Hall-D/detector/fdc/budget/FDC_budget.pdf]
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
 
#* PCB status
 
#* PCB status

Revision as of 19:49, 17 November 2010

November 18, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status sketch
    • Frame lamination
    • FDC change request discussion [1]
  2. Electronics (Fernando, Chris, Roger)
    • PCB status
    • Other
    • Cathode foil and rigid-flex production
  3. Engineering (Bill, David, Beni)
    • Wire stringing status model.
    • Other
  4. Full-scale prototype tests
  5. Other