Difference between revisions of "Minutes-11-4-2010"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
#* Frame lamination
 
#* Frame lamination
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
#* Update on PCBs
+
#* Update on PCBs [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination1.jpg delaminated PCB1] and [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination2.jpg PCB2]
 
#* Cathode foil and rigid-flex procurement
 
#* Cathode foil and rigid-flex procurement
 
#* Cathode foil inspection plan
 
#* Cathode foil inspection plan

Revision as of 16:00, 4 November 2010

November 4, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status
    • Frame lamination
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs delaminated PCB1 and PCB2
    • Cathode foil and rigid-flex procurement
    • Cathode foil inspection plan
  3. Engineering (Bill, David)
    • Wire stringing status; position measurement system.
    • Other
  4. Full-scale prototype tests
    • status, timing with fADC125 (Beni)
    • wire offset studies (Lubomir)
  5. Other