# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)
#* Update on PCBs [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination1.jpg delaminated PCB1] and [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination2.jpg PCB2]
+
#* Update on PCBs: [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination1.jpg delaminated PCB1] and [http://www.jlab.org/Hall-D/detector/fdc/images/Delamination2.jpg PCB2]
 
#* Cathode foil and rigid-flex procurement
 
#* Cathode foil and rigid-flex procurement
 
#* Cathode foil inspection plan
 
#* Cathode foil inspection plan
Line 25: Line 25:
 
== Production ==
 
== Production ==
  
- The company will start bringing materials for the clean room on Nov 24. The AC for the whole area will be installed by Dec 7. Before that for the lamination we will use mostly the office (low humidity <40%) and the granite tables outside for vacuum bagging if the humidity is low. That was not the case today.
+
- The company will start bringing materials for the clean room on Nov 24. The AC for the whole area will be installed by Dec 7. Before that for the lamination we will use mostly the office (low humidity <40%), and the granite tables outside for vacuum bagging if the humidity is low. That was not the case today.
  
 
- We got all the wire frames (32) and spacer rings (30). 17 wire frames laminated; 14 are back at Vision machine for fly cut.  
 
- We got all the wire frames (32) and spacer rings (30). 17 wire frames laminated; 14 are back at Vision machine for fly cut.  
Line 31: Line 31:
 
== Electronics ==
 
== Electronics ==
  
- Chris: by Wednesday we will have all the PCBs populated. The company sent two pictures (link above) show delaminations on two of the boards.
+
- Chris: by Wednesday we will have all the PCBs populated. The company sent two pictures (link above) showing delaminations on two of the boards. They claim the delamination was there when the boards arrived. But Chris would have seen it!? Roger: the heating cycle they use may cause delamination. Chris will ask
 +
the company for information about this.
  
 +
- Roger: the cathode foil Gerber files will be sent right after the meeting. The extra connectors were included. 
 +
 
- Fernando: the first article signal cables will arrive by mid November and Chris is working on a board to be used for testing. The solder material (japanese) recommended from UVA is no longer available. Chris ordered similar materialial from other company to exercise. Working on the sole source procurement of the ASICs. Fermilab is also intersted in the same ASICs and Fernando discussed if we can share with Fermilab the costs
 
- Fernando: the first article signal cables will arrive by mid November and Chris is working on a board to be used for testing. The solder material (japanese) recommended from UVA is no longer available. Chris ordered similar materialial from other company to exercise. Working on the sole source procurement of the ASICs. Fermilab is also intersted in the same ASICs and Fernando discussed if we can share with Fermilab the costs
 
for the mask (~$100K).
 
for the mask (~$100K).

Revision as of 16:32, 4 November 2010

November 4, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
    • Blue Crab status
    • Frame lamination
  2. Electronics (Fernando, Chris, Roger)
    • Update on PCBs: delaminated PCB1 and PCB2
    • Cathode foil and rigid-flex procurement
    • Cathode foil inspection plan
  3. Engineering (Bill, David)
    • Wire stringing status; position measurement system.
    • Other
  4. Full-scale prototype tests
    • status, timing with fADC125 (Beni)
    • wire offset studies (Lubomir)
  5. Other