Difference between revisions of "Minutes-11-8-2012"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_November_8_2012.xlsx Construction Tracking] (Dave)
 
#* First package testing (Vlad)
 
#* First package testing (Vlad)
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests] (Vlad)
+
# Corrosion [http://www.jlab.org/Hall-D/detector/fdc/corrosion/Spreadsheet.pdf tests], [http://www.jlab.org/Hall-D/detector/fdc/corrosion/viton_solder.jpg corroded solder on Viton sample] (Vlad)
 
# Engineering (Bill)
 
# Engineering (Bill)
 
#* Bubbler issue and pressure control [http://www.omnicontrols.com/images/PDF/A3000_cat.pdf]
 
#* Bubbler issue and pressure control [http://www.omnicontrols.com/images/PDF/A3000_cat.pdf]

Revision as of 11:52, 8 November 2012

November 8, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • First package testing (Vlad)
  2. Corrosion tests, corroded solder on Viton sample (Vlad)
  3. Engineering (Bill)
    • Bubbler issue and pressure control [1]
  4. Electronics (Chris, Nick)
  5. Third package tests FDC E-log (Beni, Simon)
    • Moving to Blue Crab?
  6. Other