Difference between revisions of "Minutes-12-16-2010"

From GlueXWiki
Jump to: navigation, search
Line 18: Line 18:
 
#* Studies with methane admixture [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 545]
 
#* Studies with methane admixture [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 545]
 
# Other
 
# Other
 
<!--
 
  
  
Line 25: Line 23:
  
 
Due to the snow, the JLab was closed and the meeting canceled. Still, the above links are current and give you some update of the FDC status.
 
Due to the snow, the JLab was closed and the meeting canceled. Still, the above links are current and give you some update of the FDC status.
 +
 +
<!--
  
 
== Production ==
 
== Production ==

Revision as of 13:15, 5 January 2011

December 16, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris, Roger)
    • PCB inspection
    • Cathode foil production and inspection report
    • Rigid-flex status
    • Other
  3. Engineering (Bill, David, Lubomir)
    • Wire stringing table and movement system control
    • Position and tension measurements [2], [3]
    • Other
  4. Full-scale prototype (Beni, Lubomir)
  5. Other


Minutes

Due to the snow, the JLab was closed and the meeting canceled. Still, the above links are current and give you some update of the FDC status.