Revision as of 13:51, 15 December 2010
December 16, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- ETC change request for FDC Tim's new schedule
- Electronics (Fernando, Chris, Roger)
- PCB inspection
- Cathode foil production and inspection
- Rigid-flex status
- Other
- Engineering (Bill, David, Lubomir)
- Wire stringing table and movement system control
- Position and tension measurements
- Other
- Full-scale prototype (Beni, Lubomir)
- Studies with methane admixture
- Other