Difference between revisions of "Minutes-12-16-2010"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
  
 
# Production (David)
 
# Production (David)
#* Blue Crab status
+
#* Blue Crab status [http://www.jlab.org/Hall-D/detector/fdc/pictures/Dsc05425_2.jpg]
 
#* ETC change request for FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/ETC_FDC_Tims_budget.pdf Tim's new schedule]
 
#* ETC change request for FDC [http://www.jlab.org/Hall-D/detector/fdc/budget/ETC_FDC_Tims_budget.pdf Tim's new schedule]
 
# Electronics (Fernando, Chris, Roger)
 
# Electronics (Fernando, Chris, Roger)

Revision as of 10:44, 16 December 2010

December 16, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris, Roger)
    • PCB inspection
    • Cathode foil production and inspection
    • Rigid-flex status
    • Other
  3. Engineering (Bill, David, Lubomir)
    • Wire stringing table and movement system control
    • Position and tension measurements [2], [3]
    • Other
  4. Full-scale prototype (Beni, Lubomir)
    • Studies with methane admixture
  5. Other