Difference between revisions of "Minutes-12-2-2010"

From GlueXWiki
Jump to: navigation, search
Line 31: Line 31:
 
- Wire frames (Bill): all wire frames inspected, we have 30 ready to go (out of 32), one is a little off the specifications, and another one is way off. Next step: gluing and laminating the PCBs that should start next week at Blue Crab. 16 cathode frames are ready; important is to check the depth of the O-ring groove.  
 
- Wire frames (Bill): all wire frames inspected, we have 30 ready to go (out of 32), one is a little off the specifications, and another one is way off. Next step: gluing and laminating the PCBs that should start next week at Blue Crab. 16 cathode frames are ready; important is to check the depth of the O-ring groove.  
  
- New schedule: we discussed the feasibility of the full tests of the packages scheduled to start at the beginning of 2012. For that we will need enough electronics to equip one full package: 12 F1TDCs, 36 fADCs, 24 anode and 108 cathode cards. According to Fernando we will have the cards and the fADCs by June 2012 and the F1TDCs by Sep 2012. Eugene looked at the last schedule for the electronics and concluded that actually we will have a good fraction of the electronics ready by the beginning of 2012. A delay is expected with the F1TDCs and we discussed options to replace those with other types of TDCs. Beni raised the question about the additional modules needed for the DAQ, since we are going to have at least two crates. All these questions require additional information from Fernando and other people, so we will continue the discussion off-line and on the next meeting.   
+
- New schedule: we discussed the feasibility of the package full tests scheduled to start at the beginning of 2012. For that we will need enough electronics to equip one full package: 12 F1TDCs, 36 fADCs, 24 anode and 108 cathode cards. According to Fernando we will have the cards and the fADCs by June 2012 and the F1TDCs by Sep 2012. Eugene looked at the last schedule for the electronics and concluded that actually we will have a good fraction of the electronics ready by the beginning of 2012. A delay is expected with the F1TDCs and we discussed options to replace those with other types of TDCs. Beni raised the question about the additional modules needed for the DAQ, since we are going to have at least two crates. All these questions require additional information from Fernando and other people, so we will continue the discussion off-line and on the next meeting.   
  
 
== Electronics ==
 
== Electronics ==

Revision as of 17:11, 2 December 2010

December 2, 2010 FDC meeting

Tentative Agenda

  1. Production (David)
  2. Electronics (Fernando, Chris)
    • PCB status
    • Cathode foil production
    • Other
  3. Engineering (Bill, David)
  4. Full-scale prototype
  5. Other


Minutes

Participants: Bill, Chris, Glenn, Eugene, Dave, Simon, Beni, and Lubomir.

Production

- Blue Crab status: the clean room construction started this week, walls are erected already.

- Wire frames (Bill): all wire frames inspected, we have 30 ready to go (out of 32), one is a little off the specifications, and another one is way off. Next step: gluing and laminating the PCBs that should start next week at Blue Crab. 16 cathode frames are ready; important is to check the depth of the O-ring groove.

- New schedule: we discussed the feasibility of the package full tests scheduled to start at the beginning of 2012. For that we will need enough electronics to equip one full package: 12 F1TDCs, 36 fADCs, 24 anode and 108 cathode cards. According to Fernando we will have the cards and the fADCs by June 2012 and the F1TDCs by Sep 2012. Eugene looked at the last schedule for the electronics and concluded that actually we will have a good fraction of the electronics ready by the beginning of 2012. A delay is expected with the F1TDCs and we discussed options to replace those with other types of TDCs. Beni raised the question about the additional modules needed for the DAQ, since we are going to have at least two crates. All these questions require additional information from Fernando and other people, so we will continue the discussion off-line and on the next meeting.

Electronics