Difference between revisions of "Minutes-3-18-2010"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 10: Line 10:
 
#** procurement of cathodes: 1)flex connection, 2)beam hole size [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_hole_size.pdf tracking meeting]
 
#** procurement of cathodes: 1)flex connection, 2)beam hole size [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_hole_size.pdf tracking meeting]
 
# Full scale prototype tests
 
# Full scale prototype tests
#* prototype test updates
+
#* prototype test updates [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book]
 
#* HV tests
 
#* HV tests
 
#* frame modification work: cathode sandwich and wire frame
 
#* frame modification work: cathode sandwich and wire frame

Revision as of 18:42, 17 March 2010

March 18, 2010 FDC meeting

Tentative Agenda

  1. FDC production
    • production space update
    • FDC procurement plans
      • procurement of cables, connectors (HV, signal, LV)
      • procurement of cathodes: 1)flex connection, 2)beam hole size tracking meeting
  2. Full scale prototype tests
    • prototype test updates FDC Log Book
    • HV tests
    • frame modification work: cathode sandwich and wire frame
    • plans for layer 3
  3. Wire frame update
  4. Cathode frame redesign
    • cathode redesign status
    • rigid-flex assembly
  5. Wire winding
    • IUCF phase 3 contract
    • plans for wire winding upgrades
    • tension specs
  6. Other