Difference between revisions of "Minutes-3-18-2010"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 10: | Line 10: | ||
#** procurement of cathodes: 1)flex connection, 2)beam hole size [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_hole_size.pdf tracking meeting] | #** procurement of cathodes: 1)flex connection, 2)beam hole size [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_hole_size.pdf tracking meeting] | ||
# Full scale prototype tests | # Full scale prototype tests | ||
− | #* prototype test updates | + | #* prototype test updates [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] |
#* HV tests | #* HV tests | ||
#* frame modification work: cathode sandwich and wire frame | #* frame modification work: cathode sandwich and wire frame |
Revision as of 18:42, 17 March 2010
March 18, 2010 FDC meeting
Tentative Agenda
- FDC production
- production space update
- FDC procurement plans
- procurement of cables, connectors (HV, signal, LV)
- procurement of cathodes: 1)flex connection, 2)beam hole size tracking meeting
- Full scale prototype tests
- prototype test updates FDC Log Book
- HV tests
- frame modification work: cathode sandwich and wire frame
- plans for layer 3
- Wire frame update
- PCB status
- wire sample measurements wire sample reports
- Cathode frame redesign
- cathode redesign status
- rigid-flex assembly
- Wire winding
- IUCF phase 3 contract
- plans for wire winding upgrades
- tension specs
- Other
- FDC naming convention naming convention
- ...