Difference between revisions of "Minutes-3-25-2010"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 20: Line 20:
 
#* some results from the tests with Sr source [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] (Lubomir)
 
#* some results from the tests with Sr source [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] (Lubomir)
 
# Cathode frame redesign
 
# Cathode frame redesign
#* MC studies of the beam hole size (Alex)
+
#* [http://www.jlab.org/~somov/fdc_rate.pdf MC studies of the beam hole size] (Alex)
 
# Other
 
# Other
 
#* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/  wire sample reports ]
 
#* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/  wire sample reports ]
 
#* updated FDC naming convention [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_NamingConvention.pdf naming convention]
 
#* updated FDC naming convention [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_NamingConvention.pdf naming convention]

Revision as of 14:04, 25 March 2010

March 25, 2010 FDC meeting


Tentative Agenda

  1. Production space update off-site floor plans
  2. Electronics
    • threshold variations in the discriminator section of the pre-amps (Fernando) Fernando's pdf
    • PCB status
  3. Frame modification
    • cathode sandwich and wire frame
    • ground plane tests (leakage, tension)
  4. Wire winding update
    • IUCF phase 3 contract phase 3 budget
    • plans for wire winding upgrades in the summer
    • tension specs
  5. Full scale prototype tests
  6. Cathode frame redesign
  7. Other