Difference between revisions of "Minutes-3-25-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 4: Line 4:
 
= Tentative Agenda =
 
= Tentative Agenda =
  
# Production space update
+
# Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans]
 
# Electronics
 
# Electronics
 
#* threshold variations in the discriminator section of the pre-amps (Fernando)
 
#* threshold variations in the discriminator section of the pre-amps (Fernando)

Revision as of 23:53, 24 March 2010

March 25, 2010 FDC meeting


Tentative Agenda

  1. Production space update off-site floor plans
  2. Electronics
    • threshold variations in the discriminator section of the pre-amps (Fernando)
    • PCB status
  3. Frame modification work
    • cathode sandwich and wire frame
    • ground plane tests (leakage, tension)
  4. Wire winding update
    • IUCF phase 3 contract
    • plans for wire winding upgrades in the summer
    • tension specs
  5. Full scale prototype tests
    • lessons learned from the HV tests
    • plans for tests in the tend
    • some results from the tests with Sr source FDC Log Book (Lubomir)
  6. Cathode frame redesign
    • MC studies of the beam hole size (Alex)
  7. Other