Difference between revisions of "Minutes-3-25-2010"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 12: Line 12:
 
#* ground plane tests (leakage, tension)
 
#* ground plane tests (leakage, tension)
 
# Wire winding update
 
# Wire winding update
#* IUCF phase 3 contract
+
#* IUCF phase 3 contract [http://www.jlab.org/Hall-D/detector/fdc/documents/budget_phase_3_3-24-10.pdf phase 3 budget]
 
#* plans for wire winding upgrades in the summer
 
#* plans for wire winding upgrades in the summer
 
#* tension specs
 
#* tension specs

Revision as of 11:24, 25 March 2010

March 25, 2010 FDC meeting


Tentative Agenda

  1. Production space update off-site floor plans
  2. Electronics
    • threshold variations in the discriminator section of the pre-amps (Fernando)
    • PCB status
  3. Frame modification work
    • cathode sandwich and wire frame
    • ground plane tests (leakage, tension)
  4. Wire winding update
    • IUCF phase 3 contract phase 3 budget
    • plans for wire winding upgrades in the summer
    • tension specs
  5. Full scale prototype tests
  6. Cathode frame redesign
    • MC studies of the beam hole size (Alex)
  7. Other