Difference between revisions of "Minutes-3-25-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans]
 
# Production space update [http://www.jlab.org/Hall-D/detector/fdc/general/ off-site floor plans]
 
# Electronics
 
# Electronics
#* threshold variations in the discriminator section of the pre-amps (Fernando)
+
#* threshold variations in the discriminator section of the pre-amps (Fernando) [http://www.jlab.org/Hall-D/detector/fdc/electronics/GPC-IITestsDiscriminator.pdf Fernando's pdf]
 
#* PCB status
 
#* PCB status
# Frame modification work
+
# Frame modification
 
#* cathode sandwich and wire frame
 
#* cathode sandwich and wire frame
 
#* ground plane tests (leakage, tension)
 
#* ground plane tests (leakage, tension)

Revision as of 13:25, 25 March 2010

March 25, 2010 FDC meeting


Tentative Agenda

  1. Production space update off-site floor plans
  2. Electronics
    • threshold variations in the discriminator section of the pre-amps (Fernando) Fernando's pdf
    • PCB status
  3. Frame modification
    • cathode sandwich and wire frame
    • ground plane tests (leakage, tension)
  4. Wire winding update
    • IUCF phase 3 contract phase 3 budget
    • plans for wire winding upgrades in the summer
    • tension specs
  5. Full scale prototype tests
  6. Cathode frame redesign
    • MC studies of the beam hole size (Alex)
  7. Other