Line 36: Line 36:
 
== Electronics ==
 
== Electronics ==
  
- Fernando presented measurements comparing the discriminator part of the pre-amp cards. The worst card so far is showing ~30% variations (min - max range). The question was whether this is acceptable. We all agreed that we don't want to modify the design of the cards.  
+
- Fernando presented measurements comparing the discriminator part of the pre-amp cards. The worst card so far is showing ~30% variations (min - max range). The question was whether this is acceptable. We all agreed that we don't want to modify the present design of the cards.  
  
<!--
+
- Next week the design of the PCBs will be finalized (Fernando, Kim, Dan) and posted on the web. We discussed also the option of having checking points on the sense wire resistors at the readout side, related to the problems with the resistors discussed later.
  
- Next week the design of the PCBs will be finalized (Fernando, Kim, Dan) and posted on the web. We discussed also the option of having checking points on the resistors at the  
+
=  Wire winding update =
 +
 
 +
- Dan informed us about the latest IUCF budget estimate for phase 3 including the wire winding upgrades. This and other topics related to the transfer of responsibilities from Dan will be discussed in a separate meeting on Monday.
 +
 
 +
- the specifications for the wire tension will be revisited at the next meeting (Lubomir) 
  
- Tim organized a visit to off-site properties (across the street) that could be used
 
for FDC production/storage purposes. We are considering this as a possible option that needs to be further investigated. There was a second meeting after this one, discussing the requirements to use the space for the FDC production.
 
  
- Fernando is working on the procurement of the HV and signal cables/connectors. He wants to make sure the lengths of the cables corresponds to the up-to-date plans.
 
  
- procurement of the cathodes: Roger and Dan are finalizing the cathode modifications. Eugene suggested to investigate the failure rate in soldering the flexes. Another showstopper is the decision about the size of the hole of the cathode strips. This issue was discussed during the last tracking meeting and Alex will investigate the effect of the copper material on the detector rates. We aim to have the same hole size on all the FDC packages. Fortunately, the decision about the the size of the wire deadening area that defines the sensitive area of the chamber, can be done later.
 
  
 
== Full scale prototype tests ==
 
== Full scale prototype tests ==
  
 +
<!--
 
- Beni finished the tests with Sr source, the prototype was moved back in the tent and the top layer was opened.
 
- Beni finished the tests with Sr source, the prototype was moved back in the tent and the top layer was opened.
  

Revision as of 18:10, 25 March 2010

March 25, 2010 FDC meeting


Tentative Agenda

  1. Production space update off-site floor plans
  2. Electronics
    • threshold variations in the discriminator section of the pre-amps (Fernando) Fernando's pdf
    • PCB status
  3. Frame modification
    • cathode sandwich and wire frame
    • ground plane tests (leakage, tension)
  4. Wire winding update
    • IUCF phase 3 contract phase 3 budget
    • plans for wire winding upgrades in the summer
    • tension specs
  5. Full scale prototype tests
  6. Cathode frame redesign
  7. Other

Minutes

Participants: Lubomir, Eugene, Bill, Daniel, Glenn, Casey, Mark, Beni, Simon, Fernando

Production space update

Two options are being considered. Properties behind Office Depot (preferably "Minuteman Press") and properties around Middle Ground Blvd (at Blue Crab) . The rent price of the latter is half the one at Office Depot, but requires building a room inside the bay area. Our position is that he most promising for FDC construction that needs only minimal modifications is the "Minuteman press". We can share the bay area with SRF (John Hogan).

Electronics

- Fernando presented measurements comparing the discriminator part of the pre-amp cards. The worst card so far is showing ~30% variations (min - max range). The question was whether this is acceptable. We all agreed that we don't want to modify the present design of the cards.

- Next week the design of the PCBs will be finalized (Fernando, Kim, Dan) and posted on the web. We discussed also the option of having checking points on the sense wire resistors at the readout side, related to the problems with the resistors discussed later.

Wire winding update

- Dan informed us about the latest IUCF budget estimate for phase 3 including the wire winding upgrades. This and other topics related to the transfer of responsibilities from Dan will be discussed in a separate meeting on Monday.

- the specifications for the wire tension will be revisited at the next meeting (Lubomir)



Full scale prototype tests