Line 13: Line 13:
 
# Wire winding update
 
# Wire winding update
 
#* info about the Monday meeting discussing the IUCF phase 3 contract (Beni)  
 
#* info about the Monday meeting discussing the IUCF phase 3 contract (Beni)  
#* possibilities for wire stringing at JLab [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/WireStringingAtJLab.docx preliminary estimate] (Lubomir)
+
#* possibilities for wire stringing at JLab [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/WireStringingAtJLab.pdf preliminary estimate] (Lubomir)
 
# Full scale prototype tests (Beni)
 
# Full scale prototype tests (Beni)
 
#* wire/cathode cleaning and HV test results  
 
#* wire/cathode cleaning and HV test results  

Revision as of 11:52, 1 April 2010


April 1, 2010 FDC meeting


Tentative Agenda

  1. Electronics
    • finalizing PCB design (Fernando, Kim) Board Improvements
    • follow up on the threshold investigations (Fernando)
  2. Cathode frame
    • cathode redesign (Bill, Roger)
  3. Wire winding update
    • info about the Monday meeting discussing the IUCF phase 3 contract (Beni)
    • possibilities for wire stringing at JLab preliminary estimate (Lubomir)
  4. Full scale prototype tests (Beni)
    • wire/cathode cleaning and HV test results
    • future plans
  5. Other
    • off-site production space update