Difference between revisions of "Minutes-4-15-2010"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
 
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
 
# Updates on the redesigns
 
# Updates on the redesigns
#* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf
+
#* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
+
 
#* Cathode redesign
 
#* Cathode redesign
 
#* results from the tests of the new frame prototype
 
#* results from the tests of the new frame prototype

Revision as of 17:55, 14 April 2010

April 8, 2010 FDC meeting


Tentative Agenda

  1. Production
    • Update on the off-site production space floor plan
    • Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
  2. Updates on the redesigns
  3. Full scale prototype
    • three-layer HV tests (Beni)
    • preparation for cosmics tests
  4. Other