Difference between revisions of "Minutes-4-15-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Production  
 
# Production  
 
#* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
 
#* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
+
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
# Updates on the redesigns
+
# Updates on:
#* finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
+
#* electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)
#* Cathode redesign
+
#* Cathode redesign (Bill, Roger)
#* results from the tests of the new frame prototype
+
#* results from the tests of the new frame prototype (Lubomir)
 
# Full scale prototype  
 
# Full scale prototype  
 
#* three-layer HV tests (Beni)
 
#* three-layer HV tests (Beni)
#* preparation for cosmics tests
+
#* preparations for cosmics tests
 
# Other
 
# Other
  

Revision as of 17:58, 14 April 2010

April 8, 2010 FDC meeting


Tentative Agenda

  1. Production
    • Update on the off-site production space floor plan
    • Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
  2. Updates on:
  3. Full scale prototype
    • three-layer HV tests (Beni)
    • preparations for cosmics tests
  4. Other