Minutes-4-15-2010

From GlueXWiki
Revision as of 17:53, 14 April 2010 by Pentchev (Talk | contribs)

Jump to: navigation, search

April 8, 2010 FDC meeting


Tentative Agenda

  1. Production
    • Update on the off-site production space floor plan
    • Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
  2. Updates on the redesigns

Readout_left], HV_right, HV_left, Readout_right

    • Cathode redesign
    • results from the tests of the new frame prototype
  1. Full scale prototype
    • three-layer HV tests (Beni)
    • preparation for cosmics tests
  2. Other