Minutes-4-15-2010
From GlueXWiki
April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine?
- Updates on the redesigns
- finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right
- Cathode redesign
- results from the tests of the new frame prototype
- Full scale prototype
- three-layer HV tests (Beni)
- preparation for cosmics tests
- Other