Minutes-4-15-2010

From GlueXWiki
Revision as of 10:13, 15 April 2010 by Pentchev (Talk | contribs)

Jump to: navigation, search

April 8, 2010 FDC meeting


Tentative Agenda

  1. Production
    • Update on the off-site production space floor plan
    • Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
  2. Updates on:
  3. Full scale prototype
    • Three-layer HV tests (Beni)
    • Preparations for cosmics tests
  4. Other