Difference between revisions of "Minutes-4-22-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
  
 
# Production  
 
# Production  
#* Update on the off-site production space [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
+
#* Update on the off-site production space [http://www.jlab.org/Hall-D/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
#* Wire winding options: IUCF, JLab using  [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/Chan_thesis_p29_38.pdf UVA equipment], or using SSC winding machine (Lubomir, Bill, Brian)
+
#* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2]
 
# Updates on:
 
# Updates on:
 
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)
 
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)

Revision as of 19:25, 21 April 2010

April 15, 2010 FDC meeting


Tentative Agenda

  1. Production
    • Update on the off-site production space floor plan
    • UVA wire stringing equipment (Brian) pin rail2
  2. Updates on:
  3. Full scale prototype
    • Three-layer HV tests (Beni)
    • Preparations for cosmics tests
  4. Other