Difference between revisions of "Minutes-4-22-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Production  
 
# Production  
 
#* Update on the off-site production space [http://www.jlab.org/Hall-D/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
 
#* Update on the off-site production space [http://www.jlab.org/Hall-D/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan]
#* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2]
+
#* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table]
 
# Updates on:
 
# Updates on:
 
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)
 
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)

Revision as of 19:29, 21 April 2010

April 15, 2010 FDC meeting


Tentative Agenda

  1. Production
  2. Updates on:
  3. Full scale prototype
    • Three-layer HV tests (Beni)
    • Preparations for cosmics tests
  4. Other