Difference between revisions of "Minutes-4-22-2010"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* off-site production space planning
 
#* off-site production space planning
 
# Updates on:
 
# Updates on:
#* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim)
+
#* Electronics: PCB, cable procurement status (Fernando)  
 
#* Cathode redesign (Bill, Roger)
 
#* Cathode redesign (Bill, Roger)
#* Tests of the new frame prototype (Lubomir)
+
#* FDC cabling [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill)  
# Full scale prototype  
+
# Full scale prototype
#* Three-layer HV tests (Beni)
+
#* status (Lubomir)
#* Preparations for cosmics tests
+
#* grounding problems (Fernando)  
 +
#* cosmics tests (Beni)
 
# Other
 
# Other
  

Revision as of 20:19, 21 April 2010

April 15, 2010 FDC meeting


Tentative Agenda

  1. Production
  2. Updates on:
    • Electronics: PCB, cable procurement status (Fernando)
    • Cathode redesign (Bill, Roger)
    • FDC cabling cabling(Bill)
  3. Full scale prototype
    • status (Lubomir)
    • grounding problems (Fernando)
    • cosmics tests (Beni)
  4. Other