Difference between revisions of "Minutes-4-22-2010"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
  
 
# Production  
 
# Production  
#* UVA wire stringing equipment (Brian) [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table]
+
#* UVA wire stringing equipment (Brian): [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table]
 
#* off-site production space planning
 
#* off-site production space planning
 
# Updates on:
 
# Updates on:
 
#* Electronics: PCB, cable procurement status (Fernando)  
 
#* Electronics: PCB, cable procurement status (Fernando)  
 
#* Cathode redesign (Bill, Roger)
 
#* Cathode redesign (Bill, Roger)
#* FDC cabling [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill)  
+
#* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill)  
 
# Full scale prototype
 
# Full scale prototype
 
#* status (Lubomir)  
 
#* status (Lubomir)  

Revision as of 20:20, 21 April 2010

April 15, 2010 FDC meeting


Tentative Agenda

  1. Production
  2. Updates on:
    • Electronics: PCB, cable procurement status (Fernando)
    • Cathode redesign (Bill, Roger)
    • FDC cabling(Bill)
  3. Full scale prototype
    • status (Lubomir)
    • grounding problems (Fernando)
    • cosmics tests (Beni)
  4. Other