- Brian reported on his visit at UVA. The parts at UVA, two pin rails (~2m each) and the parts of the position measurement system, are in good condition and can be used. Brian thinks that the stringing of the FDC at JLab using the UVA procedure/equipment is doable; the number of the wires is not that big to require winding machine. Brian and Bill discussed some possible improvements related to the way the pin rails are attached to the table/ strong hold 
+
- Brian reported on his visit at UVA. The parts at UVA, two pin rails (~2m each) and the parts of the position measurement system, are in good condition and can be used. Brian thinks that the stringing of the FDC at JLab using the UVA procedure/equipment is doable; the number of the wires is not that big to require winding machine. Brian and Bill discussed some possible improvements related to the way the pin rails are attached to the table/ strongback 
  
 
<!--
 
<!--

Revision as of 11:37, 23 April 2010

April 22, 2010 FDC meeting


Tentative Agenda

  1. Production
  2. Updates on:
    • Electronics: PCB, cable procurement status (Fernando)
    • Cathode redesign (Roger)
    • FDC cabling (Bill)
  3. Full-scale prototype
    • status (Lubomir)
    • grounding problems (Fernando)
    • cosmics tests (Beni)
  4. Other



Minutes

Participants: Bill, Roger, Brian, Glenn, Chuck, Mark, Simon, Beni, Eugene, Lubomir

Production

- Brian reported on his visit at UVA. The parts at UVA, two pin rails (~2m each) and the parts of the position measurement system, are in good condition and can be used. Brian thinks that the stringing of the FDC at JLab using the UVA procedure/equipment is doable; the number of the wires is not that big to require winding machine. Brian and Bill discussed some possible improvements related to the way the pin rails are attached to the table/ strongback